ELECTRIC, WITH AN EDGE

Pad Mounted Transformer

HIGH-QUALITY. CUSTOMIZABLE. GUARANTEED.
30000 + Happy Customers
5/5

Pad-mounted transformers are made in power ratings from around 75 to around 5000 kVA and often include built-in fuses and
switches.

Primary power cables are connected with elbow connectors, which can be operated when energized using a hot stick and
allows for flexibility in repair and maintenance.

Our pad mounted transformer is designde and tested in accordance with industry standards including CSA,ANSI C.57,DOE,and IEEE as applicable.

Three Phase Pad Mounted Transformer

TECHNICAL SPECIFICATION

PRODUCT DETAILS

Liquid-Filled Loop Feed Pad Mounted Transformer.
Our Liquid-Filled Loop Feed Pad Mounted Transformer is designed and tested in accordance with industry standards including CSA, ANSI C.57, DOE, and IEEE as applicable.

− Mild steel, optional stainless steel tank
− Three-point latching door for security
− Removable sill for easy installation
−Stainless steel cabinet hinges and mounting studs
Bolted-on cabinet with removable sill having the following depths:
19″dedp for 300kva through 750 kva
22″deep for 1000kva through 1500 kva
24″deep for 2000kva through 3750kva
30″deep for 5000kva through 7500kva
− Live front construction & dead front construction
− Steel HV/LV compartment barrier
− Oil drain plug for 500 kVA and below
− 1” drain valve with sampler for 750 kVA and above

 − Five-legged core/coil assembly.
− Removable LV neutral ground strap; as required
− Nameplate per ANSI requirement
−Self-actuating pressure relief valve
− Lifting lugs (4)Three-point latching door for security
− Removable sill for easy installation
−Stainless steel cabinet hinges and mounting studs
− Live front construction & dead front construction
− Steel HV/LV compartment barrier
− Oil drain plug for 500 kVA and below
− 1” drain valve with sampler for 750 kVA and above
− Oil fill plug
− Five-legged core/coil assembly.
− Removable LV neutral ground strap; as required
− Nameplate per ANSI requirement

OUR CERTIFICATE

FAQ

Until now, Bitcoin mining power transformers have been shipped out from Daelim's transformer production plant in China every month. They were sent to the United States, Canada, Russia, Ukraine, Venezuela, Kenya and other countries. These countries are also the countries with the most bitcoin production in the world.
  • Designed for Bitcoin mining power system, providing professional services for your mining farms;
  • Rich experience, applied in many countries, can quickly customize the program for you;
  • The power utilization rate is more than 15% higher than other transformers in the market, saving you money;
  • 15 years of the transformer production factory, professional design team, fast effect;
Currently, Bitcoin mines mainly use three-phase power supplies.
Mainly used in places that require a large amount of electricity, such as industry, commercial core areas, Bitcoin mining farms, etc.
In North America, the main output voltage of the power station is usually between 12kv and 36kv. When outputting power from a power plant, boosting is performed in order to increase efficiency. Decompression distribution will be carried out to the use area.
This has created a contradiction in the electricity demand of the encrypted farm. Because the PSU of the encrypted farm requires high-voltage power to improve the efficiency of digging.
Therefore, the encryption farm needs to purchase step-up transformers.
The configuration of power transformers in Bitcoin mines is mainly calculated according to MW:
That is: 10mw requires 4 sets 2500kva step-down transformers.
Determine how many step-down transformers you need to purchase based on the MW used by your encryption farm.
There are two main types of step-up transformers suitable for encryption farms: pad-mounted transformer and mini substation Transformer.
Large encryption farms usually choose pad-mounted transformers. Small and medium encryption farms usually buy: mini substation Transformer.
You can also tell us your needs. We can provide you with solutions.
  • Output power: The designed transformer must satisfy that the secondary winding can transmit the rated power to the load, so as to meet its operating requirements.
  • Operational efficiency: It determines the maximum power loss allowed by the transformation.
  • Maximum temperature rise: When the transformer works under certain conditions, its ambient temperature, heat dissipation capacity, altitude and other factors must be considered.
A: Generally it is 20 days if the goods are in stock, or 30 days if the goods are not. It is according to the quantity.
Export standard package or special package according to customer’s requirement.
We have been worked in the electric industry for nearly 25 years.

CUSTOMERS REVIEWS

Skyrocket Your Business with Daelim

Tell us your detailed requirement, we will provide you the best solution.

 

About Bin Dong

Hello, I am Bin, General manager of Daelim which is a leading transformer manufacturer. As a expert, I am glad to share my experience in transformer to you. I believe our professional team can always provide you with high quality service and we are ready to provide you with one stop solution. If you have problems when you are looking for the equipment, what you need to do is tell us.